Document Type : Original Reaearch Article

Author

Materials and Energy Research Center, Nanotechnology and Advanced Materials Department, Karaj, Iran

Abstract

Principally, mineral processing and beneficiation process on some placer mines can be considered from two points of view i.e. technical and economical aspects. Although, co-extraction of some strategic elements with high added value is conceivable, utilizing of these type of mines is also possible as raw material and feed in ferrous and non-ferrous metal industry. In this research, feasibility study of placer mine beneficiation for co- extraction of strategic elements and Iron has been investigated. Firstly, mineralogy, chemical properties and physical properties of samples have been studied via different characterization methods such as: screening, XRD, XRF, OM and EPMA analysis. Furthermore an appropriate process has been designed by using the gravity separation, ball mill grinding and magnetite separation in order to achieve suitable fineness for iron, titanium and vanadium concentrates. The designed process is capable of producing the ore concentrate with approximate 57 wt% Iron, 8 wt% TiO2 and 0.8 wt% V2O5. The outcome of the aforementioned process is valuable since it has been shown in the literature that the extraction of vanadium can be completed by leaching process with hot water and separation of titanium can be achieved during the melting process of iron from the slag.

Keywords

  1. 1. Chen, D.S. , Song, B. , Wang, L. , Wang, W.J. ,“Solid state reduction of panzhihua titanomagnetite concentrates with pulverized coal”, Mineral Engineering, 2011, 24, 864-869.
    2. Habashi, F. “Handbook of Extractive Metallurgy”, 1998, Wiley-VCH. 3. Udy, M.C. , Manson, W.S. , “Electric smelting
    of magnetite from savage river”, Dressing Investigations, 2004, 207-226.
    4. Gupta, C. K. , Krishnamurthy, N. , “Extractive Metallurgy of Vanadium”, 1992, India, Elsevier, Bhabba Atomic Research Center, Metallurgy Division. 
    5. Dmitriev, A.N. , Mukhitdinov, Y.S. , Rakhimov, V.R. Sitdikov, F. G. ,“Pyrometallurgical technology for processing titanomagnetites from the TEBINBULAK deposit, Mettallurgist, 2005, 49,1-2.
    6. Moskalyk, P. R. , Alfantazi, A. M. ,“Processing of vanadium: review”, Minerals engineering, 16, 2003, 793-805.

    7. فرآوری سنگ آهن پلاسری سنگان در مقیاس آزمایشگاهی، برای تولید کنسانتره قابل باردهی به گندله­سازی، نعیمه غفوری توران، دانشگاه تهران، کارشناسی ارشد مهندسی معدن- فرآوری مواد معدنی-1388

    8. Dmitriev, A. N. , Mukhitdinov, Ya. S. , Rakhimov, V. R. Sitdikov, F. G. “Pyrometallurgical technology for processing
    titanomagnetites from the TEBINBULAK deposit”, Mettallurgist, 49, 2005, 1-2.
    9. Sadykhov, G. B. , Olyunina, K. V. , Goncharenko, T. V. “Phase Composition of the Vanadium-Containing titanium slags
    forming upon the reduction smelting of the titanomagnetite concentrate from the Kuranakhsh deposit”, Russian Metallurgy (Metally), 7, 2010, 581-587.
    10. Roshchin, V.E. , Asanov, A. V. , Roshchin, V. R. “Soild-phase prereduction of iron-vanadium concentrates and liquid-phase separation of the products of their reduction”, Russian Metallurgy (Metally), 11, 2010, 1001-1008.
    11. Hukkanen, E. Walden, H. , “The production of vanadium and steel from titanomagnetites”, International Journal of Mineral processing, 15, 1985, 89-102.
    12. Jena, B. C. , Dresler, W. , Reilly, I. G. , “Extraction of titanium, vanadium and iron from titanomagnetite deposits at pipestone lake, Manitoba, Canada”, Minerals engineering, 8, 1995, 159-168. 

    1.